# Data center jobs: what a project brings a community

A data center creates many temporary construction jobs, a small permanent staff, and steady work for outside contractors. The permanent count is small for the size of the investment, so communities weigh jobs beside tax base, infrastructure, and demands on power and water.

[See how we work with landowners](/who-we-serve/landowners/)

In this article

1. [What data center jobs are](#what-data-center-jobs-are)
2. [Construction jobs during the build](#construction-jobs-during-the-build)
3. [Permanent staff after the build](#permanent-staff-after-the-build)
4. [Contractors who service the site](#contractors-who-service-the-site)
5. [Why permanent job counts are small](#why-permanent-job-counts-are-small)
6. [What else a community weighs](#what-else-a-community-weighs)
7. [What the public record shows](#what-the-public-record-shows)
8. [What it means for a landowner](#what-it-means-for-a-landowner)
9. [Key recap](#key-recap)
10. [Questions](#questions)
11. [References](#references)

> **Quick summary:** This guide explains the jobs a data center creates: construction work, a permanent staff, and outside contractors. It is for residents, officials, and landowners who hear job figures at a hearing. The key point: construction jobs are many and temporary, permanent jobs are few, and a community weighs them beside tax base, infrastructure, power, water, and noise.

## What data center jobs are

Data center jobs fall into three groups: construction work during the build, a permanent operating staff, and outside contractors who service the site. Each group differs in size, length, and skill, so ask about each one on its own.

## Construction jobs during the build

Construction jobs are the largest group, and they are temporary. A campus build uses trades such as electricians, pipefitters, ironworkers, concrete crews, equipment operators, and general laborers. Large campuses often build in phases, so construction work can return over several years as new buildings go up.

Many of these workers come from a regional labor pool, not only from the county. The local share depends on the contractors, the trades available nearby, and any hiring agreement the local government negotiates.

## Permanent staff after the build

The permanent staff is small compared with the building. A finished data center runs with roles such as facility technicians, electrical and mechanical engineers, security officers, and operations managers. These jobs are skilled and continuous, because the building runs day and night.

Some roles go to local residents and train on site. Others move in with the operator.

## Contractors who service the site

Contractors carry much of the ongoing work. Firms such as electrical contractors, generator and cooling service companies, cleaning crews, and grounds crews work under contract, not on the operator's payroll. That work supports local businesses, but it rarely appears in the job count an operator announces.

## Why permanent job counts are small

Permanent job counts are small because a data center is mostly equipment. The money goes into buildings, electrical gear, cooling systems, and servers, and machines do most of the work. A factory of similar cost would usually employ far more people, and that comparison comes up at public hearings.

> **The short version:** Ask for three numbers, not one: construction jobs and their length, permanent jobs on the operator's payroll, and contract work. A single announced figure hides the difference.

## What else a community weighs

A community weighs jobs against several other effects of a project.

- **Property tax base.** Buildings and equipment can add taxable value. [State exemptions and exclusions](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-274.html) can change what is taxed. Ask the county tax office or a tax attorney to read those rules and any local incentive agreement before you count the revenue.
- **Infrastructure the project pays for.** A project may fund substations, lines, water mains, or road improvements that later serve others. Written agreements with the utility and the local government set who pays for what.
- **Demand on power.** A large new load can require new generation and transmission. See [Data center power requirements: what a campus needs from the grid](/insights/data-center-power-requirements/).
- **Demand on water.** The cooling design decides how much water a site draws. See [Data center water usage: what it means for a site](/insights/data-center-water-usage/).
- **Noise near homes.** Cooling equipment and generator tests can reach neighbors. See [Data-center noise, and why it now decides sites](/insights/data-center-noise/).

No single item settles the question, and reasonable people weigh them differently. [Are data centers bad? The objections, checked against the record](/insights/data-center-misconceptions/) checks the common objections against public records.

## What the public record shows

The public record shows incentive agreements, board minutes, rezoning conditions, and tax assessments once a project is built. It cannot show future hiring, the local share of jobs, or wages before an operator discloses them. The operator and the local economic development office confirm those figures.

> **Take action:** If a buyer has asked about your land, learn how the tract reads before the hearing does. Start with [Is your land a data-center site?](/who-we-serve/landowners/)

## What it means for a landowner

A landowner who sells to a data center sells into this debate. The board that hears the rezoning weighs jobs, tax base, and demands on public systems, and can approve conditional-zoning terms the petitioner accepts in writing. [State law](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-703.html) limits them to ordinance or plan compliance, or impacts the development is expected to create. See [The neighbors decide more sites than the zoning map](/insights/neighbors-and-public-opposition/), [A zoning label is only the beginning](/what-we-check/zoning-and-moratoriums/), and [How to sell land to a data center](/insights/how-to-sell-land-to-a-data-center/).

## Key recap

- Data center jobs fall into three groups: construction, permanent staff, and outside contractors.
- Construction jobs are the largest group, and they are temporary, though phased campuses can bring them back.
- The permanent staff is small because a data center is mostly equipment.
- Communities weigh jobs beside tax base, infrastructure, demand on power and water, and noise near homes.
- Public records show incentive agreements and rezoning conditions, not future hiring or wages.

## Questions

### Do data centers create many local jobs?

They create many temporary construction jobs and a small number of permanent ones. How many go to local residents depends on the contractors, the regional labor pool, and any local hiring agreement.

### Who decides what infrastructure a project pays for?

The developer, the utility, and the local government set it in written agreements, such as a development agreement or a utility contract. Board minutes and the agreement text record the terms once they are public.

### Does a data center change the local tax base?

It can add taxable value to the parcel it occupies. State exemptions and exclusions can reduce what is taxed. How that affects tax rates or other owners depends on the county budget and state law, which the county tax office explains.

## References

Primary sources cited on this page, in APA style.

- N.C. Gen. Stat. § 105-274 (2025). [https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-274.html](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-274.html)
- N.C. Gen. Stat. § 160D-703 (2025). [https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-703.html](https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-703.html)

## Local approvals and zoning in North Carolina

- [A zoning label is only the beginning](/what-we-check/zoning-and-moratoriums/)
- [How to read a data-center moratorium](/insights/reading-a-data-center-moratorium/)
- [Where North Carolina has paused data centers](/research/north-carolina-data-center-moratoriums/)
- [Who regulates a property in North Carolina](/insights/who-regulates-a-property-in-north-carolina/)
- [Special use permit, conditional zoning, or rezoning](/insights/special-use-permit-conditional-zoning-rezoning/)
- [The neighbors decide more sites than the zoning map](/insights/neighbors-and-public-opposition/)
- [Data-center noise, and why it now decides sites](/insights/data-center-noise/)
- [Setback requirements: what they are and how to find them](/insights/setback-requirements/)
- [Are data centers bad for the environment?](/insights/are-data-centers-bad-for-the-environment/)
- [Are data centers bad? The objections, checked against the record](/insights/data-center-misconceptions/)
- [Why are people against data centers?](/insights/why-are-people-against-data-centers/)
- [Are data centers dangerous to live near?](/insights/are-data-centers-dangerous/)
- [How a data center gets approved in North Carolina](/insights/data-center-approval-process-north-carolina/)
- [How to take part in a data center hearing in North Carolina](/insights/data-center-public-hearing/)
- [Community benefit agreements for data centers: what residents can ask for](/insights/data-center-community-benefit-agreements/)
- [Zoning variance: when the board of adjustment can relax a rule](/insights/zoning-variance/)
- [Historic districts and the certificate of appropriateness](/insights/historic-district-certificate-of-appropriateness/)
- [Eminent domain in North Carolina: when the government takes land](/insights/eminent-domain-north-carolina/)
- [Spot zoning: when a rezoning of one tract is unlawful](/insights/spot-zoning/)
- [Vested rights and permit choice in North Carolina](/insights/vested-rights-north-carolina/)
- [Development agreements in North Carolina](/insights/development-agreement/)
- [How to rezone property in North Carolina](/insights/how-to-rezone-property/)
- [Annexation in North Carolina: when a town takes in land](/insights/annexation-north-carolina/)
- [Certificate of occupancy in North Carolina](/insights/certificate-of-occupancy/)
- [Building permits in North Carolina: what needs one and how it works](/insights/building-permit-north-carolina/)
- [Zoning permits: the approval before the building permit](/insights/zoning-permit/)
- [How to read a zoning map](/insights/zoning-map/)
- [Short-term rental zoning in North Carolina: what a town can regulate](/insights/short-term-rental-zoning/)
- [Home occupations: running a business from a residential lot](/insights/home-occupation/)
- [Unzoned land in North Carolina: what rules still apply](/insights/unzoned-land-north-carolina/)
- [The bona fide farm exemption from county zoning](/insights/bona-fide-farm-exemption/)
- [Can a data center take your land by eminent domain?](/insights/data-center-eminent-domain/)
- [A data-center moratorium is a pause, not a ban: what it can and cannot do](/insights/what-a-moratorium-does/)
- [A rezoning is a vote, not a formality: what a buyer cannot promise a seller](/insights/rezoning-is-a-vote/)

Send the requirements. We reply with how we would run the search.

[See how we work with landowners](/who-we-serve/landowners/)

## Tell us what the project needs

Load, acreage, counties, and timeline. We reply with how we would run the search and where we would start.