# Data center cooling systems and what they ask of a site

A data center cooling system carries heat from the servers to the outdoors. Air cooling with chillers, evaporative cooling, closed loops, and liquid cooling need different combinations of water, power, and equipment space. Water and electricity use depend on how those pieces work together.

[See how we check water and sewer](/what-we-check/water-and-sewer/)

In this article

1. [What a data center cooling system does](#what-a-data-center-cooling-system-does)
2. [Air cooling with chillers](#air-cooling-with-chillers)
3. [Evaporative cooling](#evaporative-cooling)
4. [Closed-loop systems](#closed-loop-systems)
5. [Liquid cooling at the rack or chip](#liquid-cooling-at-the-rack-or-chip)
6. [Hybrid designs](#hybrid-designs)
7. [What the site decides](#what-the-site-decides)
8. [Key recap](#key-recap)
9. [Questions](#questions)
10. [References](#references)

> **Quick summary:** This guide compares the main data center cooling systems and what each asks of a site in water, wastewater, equipment space, and noise. It is for buyers and landowners who weigh whether a tract can support a campus. The key point: the outdoor heat-rejection equipment, not the label on the indoor system, decides how much water and space a site must supply.

## What a data center cooling system does

A data center cooling system moves heat out of the servers and then out of the building. Every design has two halves. One carries heat away from the servers, by air or by liquid. The other rejects that heat outdoors, through evaporation, chillers, or dry coolers. See [DOE cooling-design guidance](https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf). See [How does a data center work?](/insights/how-does-a-data-center-work/).

The buyer's mechanical engineer picks the design. The site limits which designs stay on the table. For how much water each design draws, see [Data center water usage: what it means for a site](/insights/data-center-water-usage/).

## Air cooling with chillers

Air cooling with chillers works by blowing cool air across the servers and returning warm air to cooling units. Chillers remove heat from a water loop that serves those units. Air-cooled chillers reject the heat to outdoor air with fans, so they use little water. Their electricity use depends on the operating conditions.

**What it asks of a site.** Pad space for chillers, enough electrical capacity for their load, and room between the equipment yard and homes for fan and compressor noise.

## Evaporative cooling

Evaporative cooling works by evaporating water, which carries heat away as it turns to vapor. Cooling towers and direct evaporative units both use this method. It consumes water and can reduce the electricity needed for cooling.

**What it asks of a site.** A steady water supply, water-treatment space, and approval from the sewer provider or discharge regulator for the concentrated water the towers drain. Towers also make noise and can release a visible plume.

## Closed-loop systems

Closed-loop systems work by circulating water or coolant in a sealed loop. The loop needs little makeup water once it is filled. The outdoor equipment can use dry coolers, chillers, or evaporative towers, so a closed loop alone does not prove low site water use. See [DOE cooling-water guidance](https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers).

**What it asks of a site.** For a dry design, yard or roof area for the coolers, little cooling water, and distance or screening for fan noise. Tower-based designs also need water and the sewer provider or discharge regulator to approve the tower's drain water.

> **Watch for:** The words "closed loop" in a proposal. A sealed loop can still hand its heat to an evaporative tower, so ask what the outdoor equipment is before you judge the water demand.

## Liquid cooling at the rack or chip

Liquid cooling works by bringing coolant to the rack or directly to the chips. Rear-door heat exchangers cool at the rack. Cold plates and immersion tanks cool at the chip. These designs handle denser, hotter equipment than air can. See [Liquid cooling in data centers: what it changes for a site](/insights/liquid-cooling-data-center/).

**What it asks of a site.** The heat still leaves through chillers, towers, or dry coolers, so the site must meet their needs, plus the power capacity the planned equipment load requires.

## Hybrid designs

Hybrid designs combine methods to balance water and electricity. Federal design guidance tells designers to reject as much heat as possible through dry coolers. A dry cooler's output depends on the outdoor air temperature, and some designs add water sprays to air-cooled equipment to improve heat rejection. See [DOE cooling-design guidance](https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf).

> **Take action:** If you are comparing tracts for a campus, have water, sewer, equipment space, and distance from homes read for each one before the mechanical design is fixed. Start with [Your short list, qualified before you see it](/who-we-serve/data-center-developers/)

## What the site decides

The site decides which cooling designs are practical.

- **Water supply.** Evaporative designs need a provider that can serve a large, steady demand.
- **Reclaimed water.** A reclaimed line can supply cooling water without drawing on drinking water. See [Reclaimed water: what it is and why large users want it](/insights/reclaimed-water/).
- **Wastewater capacity.** Where tower drain water goes to a sewer, the provider must accept its volume and chemistry.
- **Equipment space.** Chiller and dry cooler yards need flat ground inside the setbacks.
- **Distance from homes.** Fan and tower noise travels, so layout and buffers matter. See [Data-center noise, and why it now decides sites](/insights/data-center-noise/).
- **Local rules.** Proposed local rules may favor particular cooling designs or require disclosure of water use. See [a county's draft review](https://www.cumberlandcountync.gov/departments/planning-group/planning-and-inspections/datacenter). See [A zoning label is only the beginning](/what-we-check/zoning-and-moratoriums/).

The public record shows water and sewer lines, service areas, and ordinance text. It cannot show spare capacity or the terms for a large user. The water and sewer provider confirms those, and the mechanical engineer confirms what a design needs. See [A water system nearby is not water for your project](/what-we-check/water-and-sewer/).

## Key recap

- Every cooling design has two halves: one carries heat away from the servers, and one rejects it outdoors.
- Air-cooled chillers and dry coolers use little water, and their electricity use depends on operating conditions.
- Evaporative cooling consumes water and drains concentrated water that the sewer provider or a discharge regulator must accept.
- A closed loop or liquid cooling does not by itself prove low site water use, because the outdoor equipment decides it.
- The site decides which designs are practical through its water supply, wastewater capacity, equipment space, distance from homes, and local rules.

## Questions

### Which data center cooling system uses the least water?

Air-cooled chillers and dry heat rejection use little cooling water. Their electricity use depends on operating temperature, climate, and equipment.

### Does liquid cooling remove the need for water?

No. Liquid cooling moves heat away from the chips well, but the building still rejects that heat outdoors. Whether that step uses water depends on the outdoor equipment.

### Can a site change its cooling design later?

Sometimes. A new building on a campus can use a different design if the site has the water, sewer, power, and space for it. The mechanical engineer and the providers confirm what fits.

## References

Primary sources cited on this page, in APA style.

- Cumberland County. (n.d.). *Data center information*. Retrieved October 2, 2026, from [https://www.cumberlandcountync.gov/departments/planning-group/planning-and-inspections/datacenter](https://www.cumberlandcountync.gov/departments/planning-group/planning-and-inspections/datacenter)
- U.S. Department of Energy, Federal Energy Management Program. (n.d.). *Cooling water efficiency opportunities for federal data centers*. Retrieved October 2, 2026, from [https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers](https://www.energy.gov/cmei/femp/cooling-water-efficiency-opportunities-federal-data-centers)
- Van Geet, O., & Sickinger, D. (2024, July). *Best practices guide for energy-efficient data center design* (DOE/GO-102024-6283). U.S. Department of Energy, Federal Energy Management Program. [https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf](https://www.energy.gov/sites/default/files/2024-07/best-practice-guide-data-center-design_0.pdf)

## Water, fiber, and access

- [A water system nearby is not water for your project](/what-we-check/water-and-sewer/)
- [Data center water usage: what it means for a site](/insights/data-center-water-usage/)
- [Liquid cooling in data centers: what it changes for a site](/insights/liquid-cooling-data-center/)
- [Reclaimed water: what it is and why large users want it](/insights/reclaimed-water/)
- [Sewer, septic, or a package plant](/insights/sewer-septic-or-package-plant/)
- [Fiber nearby is not fiber to the site](/what-we-check/fiber/)
- [Fiber route diversity: why two carriers are not two routes](/insights/fiber-route-diversity/)
- [A road beside the land is not a way in](/what-we-check/access-and-roads/)
- [NCDOT driveway permit: how access to a state road works](/insights/ncdot-driveway-permit/)
- [Septic permits in North Carolina: the improvement permit, the construction authorization, and the operation permit](/insights/septic-permit-north-carolina/)
- [Drainfield: how a septic drainfield works and what limits it](/insights/drainfield/)
- [Licensed soil scientists: what they do for a land purchase](/insights/soil-scientist/)
- [Well permits in North Carolina: drilling a private well](/insights/well-permit-north-carolina/)
- [Driveway culverts: who approves the pipe under your drive](/insights/driveway-culvert/)
- [Septic tank size in North Carolina: how the rules set it](/insights/septic-tank-size/)

Send the requirements. We reply with how we would run the search.

[See how we check water and sewer](/what-we-check/water-and-sewer/)

## Tell us what the project needs

Load, acreage, counties, and timeline. We reply with how we would run the search and where we would start.

[Start a site search](/contact/)

[Try the calculators](/tools/)